As-built performance
The final stage impact assessment of the Future Buildings Standard. Secondary legislation, statutory guidance published by MHCLG 24 March, 2026 defines as-built performance as being "The actual energy performance of a building once it has been constructed and commissioned, which may differ from performance estimated at the design stage."
The term is also used to describe complete drawings of a finished buildings, though the intention of these is similar and at a similar stage the content and outcome is different. See article as-built drawings and record drawings.
For further information and details from the perspective of performance see performance gap between building design and operation, closing the gap between design and as-built performance, post occupancy evaluation., building use studies (BUS), building performance evaluation, performance in use and more.
[edit] Related articles on Designing Buildings
- Appointing consultants.
- As-built drawings and record drawings.
- Building performance evaluation.
- Building performance metrics.
- Closing the gap between design and as-built performance.
- Energy audit.
- Maintenance.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Performance in use.
- Post occupancy evaluation.
- Post occupancy evaluation process.
- Sick building syndrome.
- Thermal comfort.
- Wellbeing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
















